ConstructionProjectDesignContract
(CivilBuildingDesignContractForConstructionProject))
ProjectName:
ProjectLocation:
ContractNo.:
Client(PartyA):
Designer(PartyB):
Signedon:
Supervisedby:
theMinistryofConstructionofP.R.China
StateAdministrationforIndustryandCommerce
PartyAentrustsPartyBtoundertakethedesignfor________.ThisContractismadebythetwopartiesaftertheirmutualagreement,thetwoPartiesherebysignthisContractasfollows:
Article1.ThisContractismadeonthebasisofthefollowingdocuments:
1.1.《TheContractLawofthePeople’sRepublicofChina》,《TheConstructionLawofthePeople’sRepublicofChina》and《ManagementProvisionsonMarketofSurveyandDesignforConstructionProjects》.
1.2.Nationalandlocalrulesandregulationsontheadministrationofsurveyanddesignforconstructionprojects.
1.3.Theapprovaldocumentsofconstructionproject.
Article2.Thedesigncontents:
projectname,projectsize,designphases,investmentsum,designfee.(asperFig.1)
Fig.1
ProjectName
ProjectSize
DesignPhases&Contents
FloorNumbers
BuildingArea(m2)
Scheme
InitialDesign
Final
3
846approx.
Plan
Section
Plan
Elevation
Section
Rendering
BuildingStructureDiagram
PowerDistributionDiagram
WaterSupply&DrainageDiagram
Article3.RelevantdocumentswhichshallbeissuedbyPartyAtoPartyB:
(asperFig.2)
Fig.2
S/N
NameofDocuments
Copies
SubmissionDate
Remarks
1
DesignInstructions
1
2
PlanofPropertyLine
1
ElectronicVersionAttached
3
SoilInvestigationReport
1
4
DesignInformationofUtilities(water,electricity,&gassupplyetc.)
1
5
GovernmentApprovalDocuments
1
ElectronicVersionAttached
Article4.DesigndocumentswhichshallbesubmittedbyPartyBtoPartyA(asperFig.3):
Fig.3
S/N
DesignDocuments
Copies
SubmissionDate
Remarks
1
SchematicDesignDocuments
1
Within15WorkingDays
2
D.D.Documents
1
Within20WorkingDays
3
WorkingDrawings
1
Within30WorkingDays
Remarks:
Inoutsidepipenetworkconstructiondocuments,thedesignbelongingtoTrademonopolyisnotincludedinthisContract.
Article5.Designfeeandthemodeofpayment:
PartyAshallpaythedesignfeeofRMB______________YuanforthisprojecttoPartyB(thisfeeshallincludetaxesandallotherdutiesthatshouldbepaidbyPartyBasrequiredbythegovernmentregulations).ThepaymentmethodisasperFig.4.
Fig.4
S/N
%ofTotalDesignFee
Amount
(Yuan)
PaymentTime
(inaccordancewiththesubmissiondateofthedesigndocuments)
Remarks:
1.PartyAshallpaythedesignfeeofeachstagewhenPartyBsubmitsthedesigndocumentofeachstage.
2.PartyAshallpay100%designfeewhenPartyBsubmitsthelastpartoftheworkingdrawings.
3.Thedesignfeeisfixedbyinitialdesignestimation,ifthereisadifferencebetweenactualdesignfeeandestimatedfee,PartyBshallreturntheoverchargeanddemandpaymentoftheshortage.Thebalancewillbesettledatthelastpayment.
4.AftertheContractisexecuted,thedownpaymentisregardedasapartofthetotaldesignfee.
Article6.Responsibilitiesofbothparties:
6.1ResponsibilitiesofPartyA:
6.1.1.AccordingtothecontentsstatedinArticle3ofthisContract,PartyAshallsubmittoPartyBbasicmaterialsanddocumentswithinspecifiedtimeandshouldberesponsibleforthecompleteness,correctnessandvalidityofthematerialsanddocuments.PartyAshallnotrequirePartyBtoconductdesigninviolationofrelevantnationalstandards.
Incasethereisadelayoflessthan15daysexceedingthespecifiedtimelimitforthedeliveryoftheabovematerialsanddocumentsbyPartyA,thetimelimitforPartyBtodeliverdesigndocumentsshallbeextendedaccordingly;incasethereisadelayofmorethan15daysexceedingthespecifiedtimelimitforthedeliveryoftheabovematerialsanddocumentsbyPartyA,PartyBshallhavetherighttore-determinethetimefordeliveryofthedesigndocuments.
6.1.2IfPartyAaltersgreatlythedesignproject,scale,conditionswhichtheyhavealreadyentrustedtoPartyB,orthematerialsprovidedbyPartyAiswrong/incompleteorPartyAmakesmajoralterationstotheapproveddesignandtheinformationgiven,asaresultofwhich,hascausedPartyBtoredothedesignwork,orhasgeneratedun-necessaryabortiveworks,bothpartiesshallenterintonegotiationandtodrawupasupplementaryContract.PartyAshallcompensatePartyBfortheadditionalworkloadinaccordancetothenewagreement.
IfPartyAhasagreedallthedesignworksconductedbyPartyBbeforetheconclusionoftheContract,itshallpaychargestoPartyBaccordingly.
6.1.3.PartyAshallpaychargesfordesigntoPartyBattheamountanddateprovidedinthisContract.IfPartyArequestsPartyBtosubmitthedesigndocumentsaheadofthestipulatedtimeasmentionedintheContract,PartyAshallgetthepriorconsentofPartyBandshouldmakeadditionalpaymentforfastandimmediateservice.
6.1.4.PartyAshallprovidesiteofficeandallrelevantofficestationaryforPartyB’spersonnelwhoarebeingsenttoworksiteduringtheconstructionstage.
6.1.5.PartyAshallprotectthedesigncopyrightofPartyB.WithoutPartyB’sconsent,PartyAshallnotrevise,duplicateortransferthedesigntoathirdpartyorusethedesigndocumentsforotherprojects.Iftheabove-mentionedishappened,PartyAshalltaketherelativelegalresponsibilityandPartyBshallhavetherighttoclaim.
6.2ResponsibilitiesofPartyB:
6.2.1.PartyBshallcarryoutdesignworkinaccordancewithtechnologicalrulesandstandardsprovidedinthisContract,submittoPartyAtherequireddesigndocumentsinrightcontent,timeandcopiesaccordingtotheclauseofArticle4andshallberesponsibleforthequalityofthedesigndocuments.
6.2.2.Thedesignlifeoftheconstructionprojectshallbe50years.
6.2.3.Upondeliveryofthedesigndocuments,PartyBshallattendtheapprovalmeetingsheldbyPartyAandtherelevantcompetentauthoritiesandshallberesponsibleformakingthenecessaryadjustments,revisionsandsupplementswhichdoesnotexceedthescopeofthedocumentsofdesignrequirementsasoriginallydefinedbasedonthecommentsofsuchmeetings.
6.2.4.PartyBisnotallowedtodiscloseandtransferanyproductdrawing,technicalandeconomicdatawhichareprovidedbyPartyAtoathirdparty.Incasethattheabove-mentionedishappened,PartyBshalltaketherelativelegalresponsibilityandPartyAshallhavetherighttoclaim.
6.2.5.PartyBisnotallowedtosubcontractthedesignworkcompletelyorpartiallytoanythirdpartywithoutthepermissionofPartyA.
Article7.DefaultResponsibility:
7.1.DuringtheperformanceoftheContract,ifPartyArequirestoterminateorcanceltheContractbeforePartyBstartsthedesignwork,PartyBwillnotreturnthedownpaymentalreadypaidbyPartyA;ifPartyBhasstartedthedesignwork,PartyAshallpayfortheactualworkloadalreadydonebyPartyB.Whentheactualworkloadofthedesignislessthanhalfoftheworkatthestage,PartyAshallpayhalfofthepaymentforthedesignworkatthestage.Whentheactualworkloadofthedesignismorethanhalfoftheworkatthestage,PartyAshallpayallthepaymentforthedesignworkatthestage.
7.2.PartyAshallpaychargesfordesigntoPartyBattheamountanddateprovidedinthisContract.Foreachdayofoverduepayment,2‰oftheoverduepaymentshallbepaidbyPartyAandthetimefordeliverybyPartyBshallbeextendedaccordingly.Wherethedelayofpaymenthasexceeded30days,PartyBshallhavetherighttosuspendtheperformanceoftheworkatthenextstageandgivewrittennoticetoPartyA.IncasethehigherauthorityorcompetentdepartmentofdesignapprovalwouldnotapprovethedesigndocumentsortheengineeringconstructionofthisContractissuspendedorstopped,PartyAshallpaytheduedesignfeetoPartyB
7.3.PartyBshallberesponsibleforcorrectinganyomissionormistakeintheirdesigndocumentsbeforetheconstruction.IfthedesignmistakemadebyPartyBhascausedlossestoPartyA,PartyBshallnotonlyberesponsiblefortakingtheremedialmeasures,butalsoshalldeductthedesignfeeforthepartofsuchlossesandshallpaycompensationtoPartyAaccordingtothedegreeofsuchloss.TheamountofthecompensationshallbediscussedanddeterminedbythePartiesas100%_____oftheactualloss.
7.4.IfitisPartyB’sownfaulttohavedelayedthesubmissionofthedesigndocumentsaccordingtothestipulatedtimeasdescribedinArticle4,PartyBshalldeduct2‰ofthedueamountofthedesignfeeonadailybasisforthedelayperiod.
7.5.AftertheContractcomesintoforce,PartyBmayrequireterminationorcancellationoftheContractandshallreturnthedownpaymentindouble.
Article8.Otherprovisions:
8.1.WhenPartyArequiresPartyBtosendsitepersonneltotheconstructionsiteforalongperiod,thetwopartiesshallnegotiatefortheseadditionalworksandsignasupplementaryservicecontract.
8.2.PartyAshallpayforalltherelevantpublicationsandstandardcollectionsofdrawingsissuedbythestateandlocalgovernmentwhichareneede