施工组织设计英文文献翻译Word格式.doc

《施工组织设计英文文献翻译Word格式.doc》由会员分享,可在线阅读,更多相关《施工组织设计英文文献翻译Word格式.doc(5页珍藏版)》请在冰点文库上搜索。

施工组织设计英文文献翻译Word格式.doc

guiding 

enterprises 

are 

able 

high 

speed, 

consumption 

completed 

building 

projects 

effective 

measures, 

but 

also 

strengthen 

improving 

efficiency 

means, 

properly 

handle 

methods, 

environment 

technology 

civil 

works 

installation 

collaboration, 

supply, 

management 

kinds 

contradictions, 

rational, 

planned 

orderly 

 

equilibrium 

guarantee 

for 

construction. 

With 

establishment 

socialist 

market 

economy, 

increasingly 

competitive 

market, 

objective 

situation 

have 

become 

demanding, 

not 

only 

personnel 

quality, 

put 

forward 

higher 

requirements 

organizers, 

engineering 

Pre-settlement 

work 

facing 

new 

challenges. 

Strict 

situation, 

some 

companies 

actively 

taken 

professional 

technical 

staff 

updated, 

training, 

science 

level 

very 

backward, 

with 

preparation 

review 

did 

attract 

enough 

attention, 

so 

there 

will 

be 

following 

common 

situations:

(1) 

audit 

compiled 

before 

start 

design:

pursue 

floor 

plans, 

cluttered, 

moving 

out 

import 

machinery 

unplanned 

demand 

labor, 

security, 

without 

assurance 

resulting 

nest 

Workers 

serious 

waste 

lower. 

(2) 

whether 

it 

professionals:

In 

cope 

authorities 

supervisory 

agencies, 

Party 

member 

or 

check 

information 

workers 

on 

behalf 

Code 

design, 

because 

data 

simply 

do 

know 

right 

now 

who 

leading 

recent 

arrangements, 

had 

casually 

made 

up, 

just 

go. 

(3) 

Some 

units, 

organizations 

understand 

process, 

write 

about 

sub-construction 

draw 

plan, 

schedule 

progress, 

regarded 

design. 

(4) 

abandon 

economy:

considerable 

number 

which 

concerned 

various 

sub-project 

considering 

aspects 

indicators, 

settlement 

disputes 

loss. 

[Example 

1] 

district 

Nanning 

City, 

life 

dormitory 

form 

water 

renovation 

project, 

was 

built 

eighties, 

has 

been 

twenty 

years, 

owners 

between 

buildings 

authorization 

their 

own 

debris 

occupied 

public 

space 

normal 

channels, 

too 

narrow 

passage 

two 

buildings, 

traffic 

problems, 

need 

manual 

handling 

materials 

sites, 

stated 

enter 

venue 

request 

additional 

secondary 

transportation 

fee, 

sign 

recognition, 

losses. 

If 

units 

field 

investigation, 

carefully 

contract 

described 

notes, 

you 

can 

reduce 

unnecessary 

trouble. 

2] 

residential 

excavation, 

site 

large, 

unit 

no 

earth 

survey 

program, 

excavation 

slope 

coefficient 

discharge, 

nor 

accumulation 

pre-construction 

earthwork 

calculation, 

original 

machine 

pit 

uppercut 

it, 

ground, 

ruptured 

nearby 

water, 

increased 

costs 

grading 

required 

show 

clear 

Jixietaiban 

increase 

away 

more, 

back 

when 

backfill 

backfill, 

economy 

by 

loss 

vain. 

3] 

products 

business 

preparing 

simple, 

even 

template 

calculations 

not, 

basement 

height 

m, 

maximum 

beam 

600 

×

1200, 

thickness 

250, 

erection 

experience 

under 

erection, 

supervision 

acceptance 

results, 

re-checking, 

results 

support 

strength 

pole 

meet 

full 

return 

work. 

Rework 

losses 

imagined. 

Such 

as 

steel 

more 

fitting 

discuss 

tender 

list 

say 

welding 

sleeve, 

said 

organization, 

talk 

sleeve 

visa;

Earthwork 

temporary 

facilities 

Shih 

group 

calculated 

long 

excess 

quota 

rules 

set 

paved 

way 

part 

claim. 

problem 

that 

this 

file 

isolated, 

targeted. 

above 

three 

examples 

fully 

process 

well 

pre-settlement 

plays 

role, 

organized 

role 

ignored 

component. 

arrangement 

company 

comprehensive 

documentation 

products. 

depth 

content 

preparation, 

divided 

into 

outline 

on. 

Meaning:

entire 

implementation 

macro-control. 

Complete 

sub-organization 

should 

include:

overview, 

quality 

manpower 

plan 

network 

diagrams, 

bar 

charts, 

safety 

details 

resources, 

energy 

conservation 

period 

measures. 

Implementation 

session, 

price 

through 

drawings 

determine 

general 

budget, 

determination 

price, 

final 

processes. 

main 

factor 

therefore, 

cost 

must 

pay 

close 

attention 

link 

regard 

address 

relations. 

Fixed 

budget 

reflect 

actual 

each 

sub-part 

component 

standards. 

It 

identify 

base;

comparison, 

based 

analysis;

analysis 

activities;

bidding 

fixed 

estimates 

indicators;

drawing 

contracts, 

basis 

prices, 

conditions, 

majority 

current 

reasonable 

labor 

project. 

However, 

many 

special 

cases 

method 

necessarily 

same 

currently 

stipulated 

scale, 

"

OK"

Guangxi 

Zhuang 

Autonomous 

Region"

stone 

calculation 

rules. 

Trench 

digging, 

time 

design"

shall 

calculated, 

clearly 

defined, 

proportion 

provisions. 

closely 

related 

cost. 

basic 

includes:

overview 

programs, 

schedule, 

layout. 

There 

analys