1、 If its the same thing, please re-adjust the rates to tie in with each other.4.Is the BQ given complete? The total cost shown under the Contract BQ (RMB975,193.00) does not tie up with the awarded sum (RMB1,210,448.79).5.专用条件a)The item in the contents page does not match with the actual clause. S14.
2、7 is know as 竣工报备in the contents page but is reflected as 竣工报表 in the actual clause.b)Clause S20.1, sub-clause 24.1 on page SCC/38. Reference is made to clause 4.6 of the 投标须知 in paragraph 1. The 投标须知 is not part of this contract, so please check to ensure the clause tie up, if not, to change accord
3、ingly.c)Item S20.1, Clause 24.3(a) actual Clause 26.1 mentioned in this clause cant be foundd)Item S20.1 Clause 24.4 actual Clause 26.1, 26.3 mentioned in this clause cant be foundAppreciate if you could clear the attached contract. I will go through at my end in parallel.Pls find the attached for y
4、our clearance pls. I had send to Amy before she goes on leave, but have not reverted to us.Lu, pls hold it until our clearance from legal. Sorry for inconvenience causedWith regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the development.item
5、 3.7.1, the duration of submitting the material is too long. The whole contract period is only 1 month+. Please reduce to reasonable time frame. They are submiting perforamnce bond right? Cannot find in the LOA. Thanks.With regards to Qn No. 2, our suggestion is to go for champagne color powder coat
6、 instead to match the rest of the developmentFor the qualification of the tenderer, Main con called to advise that they will provide the qualification of the firm that they are working with in due course, which I think is ok given the tight timeline (caroline is this ok with you ? pls advise).For de
7、sign/drawings sonny pls follow up asap.For contract provisions yan mei pls follow up asap.By copy of this mail, appreciate Amy, Michelle and Caroline can help review in parallel and revert with your comments, if any, in parallel.Please understanding that we are calling several contracts in parallel
8、in order to meet the tight timeline and your assistance in the above are appreciated.Please reply to question number 2 as a matter of urgency so DLS can reply to the tenderers.Pls include in your prelim assessment and provide the prelim assessment on Monday morningPlease reply to the following urgen
9、tly. The tenderers need to do some design development as part of their tender return so we need to give some more lead timeAs per discussed yesterday, please provide the followings:1.SKK spray paint finish as a replacement material for stone cladding as indicated in Capols drawing. Please provide th
10、e specification for tenderers.4.Door finish.7.Please provide design intent write-up for the canopy as indicated in Capols drawing.Please provide in Chinese for the above where possible as we are dealing with local contractors.Please understanding that we are calling several contracts in parallel in
11、order to meet the tight timeline and your assistance in the above are appreciatedPer our concall for the Lift Supply LOA comments/concensus as follow as noted by QS in the attached :1.item 1.2 order of listing suggest update the special conditions instead2.item 3.3 (3) maintain 75% max per agreement
12、 during tender clarifications3.item 3.4 (d) suggest amend the minor error when signing the contract4.item 3.6 (3) same as item 2 above.5.other queries as clarified by QS.As the above items have been clarified, there is no more issue with the supply LOA which KONE had stamped and returned. QS will up
13、date on the special conditions and installation LOA separately for discussion/concall asap (Jerry pls target for Friday afternoon say 4pm as spoken)6.item 1.2 order of listing suggest update the special conditions instead7.item 3.3 (3) maintain 75% max per agreement during tender clarifications8.ite
14、m 3.4 (d) suggest amend the minor error when signing the contract9.item 3.6 (3) same as item 2 above.10.other queries as clarified by QS.2.SKK spray paint finish as a replacement material for stone cladding as indicated in Capols drawing. Please provide the specification for tenderers.5.Door finish.
15、8.Please provide design intent write-up for the canopy as indicated in Capols drawing.1.I have no further comments on both the bond and advance payment bond, however, as there are deviations from the format given for the bond, please ensure that clearance is obtained from May Lan, Edward and Tracy a
16、s per SOP requirements.2.Also, if the 2 bonds are not from the big 4 banks here, please obtain clearance from May Lan as wellFor update, phase 2 main contract is being signed by SCG and they target to return by next Monday. Appreciate your URGENT review and revert your comments, if any, on the relat
17、ed performance bonds per attached for QS/SCG follow up on activationcalled me this morning. He mentioned that main con would like to deduct the P&A fees in their payment. Can you pls help to check up the details in your recommended payment cert (payment 10.2), have you actually deducted the fees alr
18、eady and pay to main con or how? Thanks.Jerry, item 3.7.1, the duration of submitting the material is too long. The whole contract period is only 1 month+. Please reduce to reasonable time frame. They are submiting perforamnce bond right? Cannot find in the LOA. Thanks3.I have no further comments on
19、 both the bond and advance payment bond, however, as there are deviations from the format given for the bond, please ensure that clearance is obtained from May Lan, Edward and Tracy as per SOP requirements.4.Also, if the 2 bonds are not from the big 4 banks here, please obtain clearance from May Lan
20、 as well.5.I have no further comments on both the bond and advance payment bond, however, as there are deviations from the format given for the bond, please ensure that clearance is obtained from May Lan, Edward and Tracy as per SOP requirements.6.Also, if the 2 bonds are not from the big 4 banks he
21、re, please obtain clearance from May Lan as well.Appreciate your URGENT review and revert your comments, if any, on the related performance bonds per attached for QS/SCG follow up on activation.7.I have no further comments on both the bond and advance payment bond, however, as there are deviations f
22、rom the format given for the bond, please ensure that clearance is obtained from May Lan, Edward and Tracy as per SOP requirements.8.Also, if the 2 bonds are not from the big 4 banks here, please obtain clearance from May Lan as well.Appreciate your URGENT review and revert your comments, if any, on the related performance bonds per attached for QS/SCG f